Evergreen Line - Fact Sheet

Evergreen Line Facts

 

Evergreen Line– Fast, Frequent, Convenient

Length: 11 km

Number of Stations: 6

Linking Major Population Centres: Coquitlam, Port Moody, Burnaby and Vancouver

Travel Time: About 13 minutes from Coquitlam City Centre to Lougheed Town Centre and about 40 minutes from Coquitlam Centre Centre to downtown Vancouver

Speed: Maximum operating speed of 80 km/hr.

Fully Integrated: Connecting without transfer to the current SkyTrain network

Estimated Cost: $1.4 billion

Anticipated Construction: Early 2011 – 2014

Regional Jobs: 8,000 new employment opportunities

Frequency (time between trains): 3 minutes during peak periods

Ridership: About 70,000 per day by 2021

Building on the strength of the existing rapid transit network, the Evergreen Line, using SkyTrain technology, will bring many benefits to the region.

Key benefits include:

Better Service

Shorter Commutes

Economic Opportunities